It turns out that more than $18 billion really doesn’t go as far as it used to.

That’s the amount to be raised within the next decade if voters in July approve the 1 percent sales tax for transportation in each of Georgia’s 12 special tax districts. Even that amount didn’t provide for the majority of road, transit and airport projects initially proposed.

Nor does the sum begin to make a dent in the $18 billion to $20 billion list of upgrades that must be made to the state’s freight handling systems – its highways, railroads, Savannah seaport and airports in Atlanta and Albany, according to a new report from the Georgia Department of Transportation.

Georgia Statewide Freight and Logistics Plan

Georgia Statewide Freight and Logistics Plan

Just $500 million of the projects to be paid for by the proposed transportation sales tax will address the separate needs of the state’s freight handling systems, according to the GDOT report. That amounts to 2.5 percent of the needs in the freight system.

The report is sobering. It links Georgia lingering economic malaise to a failure to invest in freight handling systems:

“Georgia has a world-class freight infrastructure that is critical to the State’s economic competitiveness.

“This infrastructure was developed through several decades of outsized investment by both the public and private sectors.

“Over the last 20 years, this investment has decreased, and this has in part been a contributor to the economic stagnation of Georgia relative to the rest of the U.S. since 2000.”

The report, “Georgia Statewide Freight and Logistics Plan, 2010-2050,” was prepared by the Atlanta office of Massachusetts-based Cambridge Systematics, Inc.

Click here to read the report on proposals to upgrade the freight system.

This economic stagnation is so entrenched that Georgia won’t recover the jobs it lost during the recession until 2020, according to Robert Sumichrast, dean of UGA’s Terry College of Business. That’s four years longer than forecast for the rest of the nation.

Click here to read about Sumichrast’s comments in a previous story in SaportaReport.com.

These freight-handling systems would appear to be as important as the mobility of the traveling public, given the full-court press to deepen the Savannah Harbor.

One central issue that’s not received much attention in public is how the Savannah port – and its feeder network of highways and railroads – is supposed to handle the additional cargo that’s to flow through it once bigger vessels start arriving at the port.

The port is slated to reach capacity by about 2026, according to a Georgia Ports Authority section of the report. That projection appears to be based on current growth trends. The report does not mention if it accounts for the bigger cargos expected to arrive once the harbor is deepened and able to accommodate bigger vessels that are expected along the East Coast once the Panama Canal is expanded.

The report states that there’s no easy source of money in sight to pay for upgrades to the freight systems.

“Funding the ‘Freight & Logistics Action Plan’ will be a challenge,” according to the report, which goes on to acknowledge potential help from the transportation sales tax. “However, the vast majority of recommended freight improvement projects will require alternative funding sources.”

According to the report, those sources include general funds at the state and federal levels for the harbor deepening; private funds for the railroads; federal, state and local funds for airports; and federal and state funding for highways, with some money from the local governments and the proposed transportation sales tax.

Georgia’s ability to handle freight would seem to be uppermost on the minds of policymakers as they lobby the federal government to deepen the Savannah Harbor.

It clearly is on the governor’s radar.

Gov. Nathan Deal said at the State of the Ports luncheon in October that upgrades to the state’s freight systems would be delayed if voters reject the T-SPLOST referendums, as in “transportation special purpose local option sales tax.”

“There are portions of the overall (cargo distribution) plan embedded in the T-SPLOSTs, so we hope they pass,” Deal said. “Without revenue from the T-SPLOST, we’ll have to ask local governments and the state to come up with the money.

“It will just take more time and won’t be as easy.”

 

About David Pendered

David Pendered, Managing Editor, is an Atlanta journalist with nearly 30 years experience reporting on the region’s urban affairs, from Atlanta City Hall to the state Capitol. Since 2008, he has written for print and digital publications, and advised on media and governmental affairs. Previously, he spent more than 26 years with The Atlanta Journal-Constitution and won awards for his coverage of schools and urban development. David graduated from North Carolina State University and was a Western Knight Center Fellow. David was born in Pennsylvania, grew up in North Carolina and is married to a fifth-generation Atlantan.
This entry was posted in David Pendered and tagged , , , , , , . Bookmark the permalink.
6 comments
Steel Wheels
Steel Wheels

All we hear is that there is no Plan B. There is always a Plan B, the legislature just doesn't want to go there - because they would have to take responsibility for taking a position. Someone should ask why GDOT didn't direct their freight study consultants to provide some key recommendations in time to inform the TIA project selection roundtables. But that's not how we do things in Georgia - we are the ready, fire, aim state.

Steel Wheels
Steel Wheels

All we hear is that there is no Plan B. There is always a Plan B, the legislature just doesn't want to go there - because they would have to take responsibility for taking a position.

Someone should ask why GDOT didn't direct their freight study consultants to provide some key recommendations in time to inform the TIA project selection roundtables. But that's not how we do things in Georgia - we are the ready, fire, aim state.

Tammy
Tammy

As this T SPLOST vote draws closer, I'm getting concerned that it will not pass. If that happens, does anyone under the Gold Dome have any type of backup plan? I don't want Atlanta to turn into Birmingham, Al.

Tammy
Tammy

As this T SPLOST vote draws closer, I'm getting concerned that it will not pass. If that happens, does anyone under the Gold Dome have any type of backup plan? I don't want Atlanta to turn into Birmingham, Al.

The Last Democrat in Georgia
The Last Democrat in Georgia

@Steel Wheels "Someone should ask why GDOT didn't direct their freight study consultants to provide some key recommendations in time to inform the TIA project selection roundtables." Because GDOT is so intensely dysfunctional these days that they couldn't find their own backside with both hands, a mirror, a probe, a light and a personal guide, that's why. Although, the agency did just find a BILLION dollars in unaccounted for money that it didn't even know it had or lost.

The Last Democrat in Georgia
The Last Democrat in Georgia

@Steel Wheels

"Someone should ask why GDOT didn't direct their freight study consultants to provide some key recommendations in time to inform the TIA project selection roundtables."

Because GDOT is so intensely dysfunctional these days that they couldn't find their own backside with both hands, a mirror, a probe, a light and a personal guide, that's why. Although, the agency did just find a BILLION dollars in unaccounted for money that it didn't even know it had or lost.