Dobbins, Next phase
Atlanta, the Atlanta BeltLine, and MARTA should collaborate to extend the Atlanta Streetcar to Ponce de Leon Avenue. Credit: Mike Dobbins

By Guest Columnist MIKE DOBBINS, professor of the practice of planning at Georgia Tech’s College of Architecture and a former commissioner of planning and community development for the City of Atlanta

Transit is a good. In an ideal world it gets people where they want to go, cleanly, efficiently, and affordably. Transit fills a need. Twenty per cent of Atlanta’s citizens are living at or below the poverty line; additionally, a growing percentage of the population doesn’t drive. This might be because they’re too old, too young, or because they simply don’t want to.

Lack of reliable transit prevents these people from getting to jobs, services, schools, and amenities. Indeed, lack of access to transit detracts from low-income residents’ ability to effectively participate in the economy.

Mike Dobbins
Mike Dobbins

But transit isn’t cheap. It costs a lot to build, and if the fare box covers a quarter of its operating cost it’s considered successful. Funding is hard to come by, particularly in Georgia, the only state that has choked off any significant state funding for transit. Federal funding is scant, highly competitive, and only covers capital, not operating, expenses.

The whole field of transportation is now in a state of rapid, uneven, and thus hard to predict, change, with service innovations like Uber, technological innovations like driverless vehicles, and the travel behavior shifts of millennials combining to make even midrange projections difficult.

So it’s important to take all this into account and to plan well and sensibly.

  • First, where are the highest concentrations of where people live and where they want or need to go (trip origins and destinations – or Os and Ds – in transportation planning lingo)?
  • This information should be the starting place for identifying trip demand and travel paths or corridors
  • Then screen that info to consider demographic characteristics so that Transit Oriented People (TOPs) layer on top of origin and destination data
  • Then make ridership projections
  • Then lay out routes that respond to this refined need and desire for transit access
Dobbins, disconnect
Atlanta’s transit plan does not serve areas that have grown into, or are growing into, significant origins and destinations. Credit: Mike Dobbins
Atlanta’s transit plan does not serve areas that have grown into, or are growing into, significant origins and destinations. Credit: Mike Dobbins

Then compare these routes with the system that is in place to identify gaps and optimize transfers, being careful to rethink existing routes based on full consideration of the now and near term future densities (for example, MARTA provides no north-south transit access along Northside Drive, even though its corridor is flanked by Atlantic Station with its shuttle to MARTA rail, Midtown West, Georgia Tech, the Georgia World Congress Center, the Falcons stadium, the Vine City MARTA station, the Atlanta University Center campuses, and West End – go figure).

  • Then consider the range of development implications along these routes (for example, one might expect that the already heavily travelled retail and residential corridors could be in store for increases in density in mixed use projects, taking advantage of the superior access that an improving corridor would provide)
  • Then, consider how to assure that new transit-induced development could provide jobs and services and be affordable for a cross-section of citizens – mixed income, mixed generational
  • Then consider the full range of transit options to best meet the now and future needs, like Bus Rapid Transit (BRT), light rail (LRT), streetcar, bus, gondola, shuttle, Uber, emerging technologies and how all these connect to walking and biking – what is now called “the last mile,” whose provision and quality affect transit attraction and use
  • Then consider the funding available or reasonably foreseeable, the full range of sources, uses, and timelines, both on the capital side and on the operating side
  • Then use a timeline to set priorities that takes into account trip demand, route improvements, transit mode (that should consider transition from less to more robust capacities over time), development goals, funding need and likelihood of obtaining
  • Then, taking into account all of the above information, identify the transit projects that implement the plan equitably – the ridership, the routes, the modes,
  • Then review the opportunities and obstacles associated with each and recalibrate the transit project timeline accordingly
  • Then review the alternatives for the agency that will detail the planning, construction, and operations necessary to carry out the program, starting with MARTA
  • Then GO.
  • What Atlanta did, though, was to start with a streetcar on the BeltLine, a solution that it has promoted since before it put in place a tax allocation district in 2005 to implement the plan. While the old railroad segments that make up the BeltLine make a lot of sense for a park and trail system, they are not a solution for the city’s transit problems, as outlined above.

    Dobbins, 50 year plan
    The 50-year plan for the Atlanta BeltLine does not connect high concentrations of origins and destinations. Credit: Mike Dobbins

    City leaders bought into the BeltLine streetcar idea as the city-saving Next Big Idea. At the time, citizens and professionals alike pointed out that a ring around – but not to – the highest concentrations of destinations met neither existing travel demand nor the needs of those most dependent on transit to get to work, services, or events.

    After five years of insisting on the transit ring, the city began to acknowledge the need for connectivity to the core areas. In 2010 the city was able to secure a federal government grant to accelerate “shovel ready” projects coming out of the great recession. Thus the Atlanta Streetcar was born, about half of its $100 million capital cost funded by federal dollars.

    Running from the Martin Luther King, Jr. Center on Auburn Avenue to Centennial Olympic Park, a distance of a little more than a mile, the route is rich in destinations but light on origins, the other half of the base equation to make transit work effectively. So the current status is that the streetcar mainly serves a few tourists per day, not having enough origins, the distance, or the speeds to attract much regular ridership.

    For this streetcar, notwithstanding that the Federal Transit Administration required MARTA’s participation on what it viewed as a questionable project, the city decided that MARTA was not sufficiently knowledgeable, efficient or committed to build or operate the streetcar and so set up its own mini-transit agency.

    So now the city has THREE transit agencies: A small unit in the Public Works department that oversaw construction and operated the streetcar until it was clear they couldn’t and outsourced its management; MARTA, which has oversight and maintenance responsibilities; and the BeltLine, which continues to plan and plan for future transit, always streetcars.

    The BeltLine’s latest plan calls for about 50 miles of trackage, still including the ring, leaving serious questions about how to pay for its construction and operation, what agency will carry it through, and with shifting travel behavior and technology whether the streetcar would even be relevant in that future.

    While a lot of time, money, and effort has gone into trying to make the “solution” fit the problem, with a successful referendum it is not too late to redirect the city’s efforts to catch up with commonsense transit planning. The Legislature last month enabled Atlanta to put forward a referendum in November 2016 or 2017 for a proposed half-percent increase in the city’s sales tax to raise $2.5 billion for transit construction. Gov. Nathan Deal has not signed Senate Bill 369.

    Dobbins, next phase
    Atlanta, the Atlanta BeltLine, and MARTA should collaborate to extend the Atlanta Streetcar to Ponce de Leon Avenue. Credit: Mike Dobbins

    Following the above steps should be the starting point. The result likely would show that other modes can more immediately address current and future ridership and meet the pressing needs to achieve equitable access.

    This access and appropriate mode choice would coordinate well with the city’s emerging emphasis on strengthening its corridors for more intense mixed use development as a balanced strategy for accommodating growing populations. In addition, such a coordinated incremental strategy would likely prove to be far more immediate, affordable, and effective than the billions now committed to building the far off streetcar, the BeltLine’s current and only plan.

    Instead, it could make good on other parts of the BeltLine’s core mission and purpose, thus far largely unfulfilled. By redirecting its streetcar capital funding, it could begin to meet the pressing needs for jobs, infrastructure and housing affordability on the west side, where the needs are greatest. It could even accelerate its trail development, now free of rebuilding bridges, a major cost factor so far, and the perhaps more vexing problem of joggers and cyclists having to share the path.

    Even so, a unified planning, development and operational agency needs to figure out how to link the Atlanta Streetcar to Ponce de Leon Avenue, where a legitimate emergence of origins and destinations is underway. These activities begin to justify the streetcar or other transit mode extension, which is probably necessary to make good on the investment already made.

    The shame of this transit reality is that it will further skew the BeltLine spending toward the east, which has already received around three-quarters of its total expenditures, seen soaring property values, displacement, and loss of affordability.

    Until the link gets made, though, the Atlanta Streetcar will continue to provide a peaceful respite from the hustle and bustle of the city around it – smooth, quiet, clean, safe, nice views, and you have the place to yourself. It’s worth the dollar.

    Join the Conversation

    11 Comments

    1. The major thing that Mr. Dobbins fails to consider, is the potential of light-rail and streetcar, as well as the BeltLine itself, to concentrate development. He bashes the ring of rail, yet doesn’t grasp the concept that it may be (or already is) a driving force in development concentration. He has a little map that shows currently dense areas, as well as emerging dense areas. The middle blob is Dowtown/Midtown, which will be served by streetcars. The upper-right blob is Emory, which will be served by the Clifton Corridor. The middle-right, yellow blob is the ‘Ponce Area’, which WILL BE SERVED by both the BeltLine light rail, as well as streetcars on North Ave. The top-most blob is Lindbergh and Buckhead. Lindbergh will have Beltline, and Clifton Corridor service on top of existing MARTA rail, and Buckhead right out refused to be included in the streetcar plan, even though they were ON IT INITIALLY.

      So, of his show places, with the caption “Atlanta’s transit plan does not serve areas that have grown into, or are growing into, significant origins and destinations. Credit: Mike Dobbins”, all are considered to be part of one form of transit plan or the other. The only one not in it, CHOSE to back out of the plan, which may change as things get built.

      Mr. Dobbins, though wrong in his specific choices of unserved areas, is generally correct that the BeltLine didn’t follow the generally accepted transit design plan, he ignores the angle that the City has in this: that the streetcars and light rail are just as much a transit option as they are a development tool. They are an attempt to bring the destinations and origins to them, in an area that will be built to handle the increase in density and people, rather than wait until people settle and try and wedge in a transit line after the fact.

    2. “The upper-right blob is Emory, which will be served by the Clifton Corridor.” – Emory is not in the City of Atlanta.

    3. After reading this article, the question that first comes to mind is: where was Mr. Dobbins during the community meetings I attended about the Streetcar System Plan? Why wasn’t this article posted a year or more ago? Why is it only *now*, mere months before a referendum, when the streetcar system plan has been finalized and approved by the city, and environmental assessments are already underway, that he speaks up?

      Has Mr. Dobbins ever driven or walked along Moreland Avenue? It’s hard to believe that if he has done so, he would still argue that the east side of Atlanta isn’t in dire need of more north-south transportation options.

      He also fails to note that the Northside Drive corridor that he called out as being unserved by transit, is a part of the Streetcar System Plan.

      For some reason, he chose not to mention that of the three areas of “highest concentration” of destinations, the largest (downtown/midtown) is already served by MARTA, the next (Buckhead) specifically demanded not to be included, and the third (CDC/Emory) is not even inside the city limits.

      I imagine anyone driving in Westside traffice would be surprised to hear that it does not have a high concentration of destinations.

      I must finally note that Mr. Dobbins was the one whose vision for Memorial Drive actually includes MORE of the reversible “suicide” lanes that are nearly universally despised by the Atlantans who have the misfortune of living nearby.

    4. @SonnyDay Nor is most of the Clifton corridor, but it will be eventually served by transit. DeKalb county will try again this next legislative session to get their own MARTA expansion bill set up, and will hopfully succeed.

      I think the point here is that, even thpugh Emory is not in Atlanta, just as you say, it was included in the drawing and is still included inMARTA’s plans.

    5. Thanks. I am glad to be refreshed by Dobbins who has dedicated his life to urban planning either as a practitioner or teacher. While sometimes we’ve agreed and sometimes we haven’t, in his op ed Dobbins raises relevant questions for public debate and serious consideration as the city leaders plan our future. Increasing connections to jobs and Atlanta’s major industries including hospitality and higher education should take priority in the discussions, in my humble opinion. One of the best MARTA lines connects travelers, visitors and employees to Hartsfield Jackson airport. This triple win could be the type of standard set for new major transit investments.

    6. Thanks for writing this, Mike, and thanks for speaking up on the same topic consistently over the years.  You were one of few experts who were willing to do so back when the religious cult of beltline transit worship was at its strongest.  All I would add is that fantastic and effective transit can be done on the streets.  Witness Zurich, which I think is a tremendous model for intown Atlanta.  It just takes some guts.

    7. HOW I GOT MY LOAN FROM THIS GREAT COMPANY
      Hello my dear people , I am Anita Frank, currently living in New jersey
      city, USA. I am a widow at the moment with three kids and i was stuck in a
      financial situation in April 2015 and i needed to refinance and pay my bills. I
      tried seeking loans from various loan firms both private and corporate but
      never with success, and most banks declined my credit ,do not full prey to
      those hoodlums at there that call them self money lender they are all scam ,
      all they want is your money and you well not hear from them again they have
      done it to me twice before I met Mr. Wilson Edwards  the most interesting part of it is that my
      loan was transfer to me within 74hours so I will advice you to contact Mr.
      Edwards if you are interested in getting loan and you are sure you can pay him
      back on time you can contact him via email………
      (wilsonedwardsloancompany@gmail.com) No credit check, no co signer with just 2%
      interest rate and better repayment plans and schedule if you must contact any
      firm with reference to securing a loan without collateral then contact Mr.
      Wilson Edwards today for your loan
      They offer all kind of categories of loan they
      Short term loan (5_10years) 
      Long term loan (20_40)
      Media term loan(10_20)
      They offer loan like
      Home loan………….,  Business
      loan……..  Debt loan …….
      Student loan……….,Business start up loan
      Business loan……. ,  Company
      loan………….. etc
      Email……….(wilsonedwardsloancompany@gmail.com )
      When it comes to financial crisis and loan then Wilson Edwards loan financial
      is the place to go please just tell him I Mrs. Anita Frank direct you Good
      Luck…………………..

    8. mnst A clarification on Memorial Drive: I was one of the graduate students who worked on the Imagine Memorial study with Prof. Dobbins and I’m now working in a new position for continued planning and coordination on Memorial Drive. The recommendation in the study about the reversible lanes was based on the judgment of our transportation team that if removing the reversible lane was not an option GDOT would consider, there are many ways to improve the design, lighting, and signage of reversible lanes to make them safer. That semester-long study received hundreds of comments from residents and public officials that are being used to revise and expand the study for formal adoption as an LCI plan. The feedback has been nearly unanimous in calling for the removal of reversible lanes and that will be clearly stated in future revisions.

    Leave a comment

    Your email address will not be published. Required fields are marked *

    This site uses Akismet to reduce spam. Learn how your comment data is processed.